Project includes a major medical block with theatres, MRI and laboratory facilities and multi-storey ward blocks. Modelled in 3D for dynamic response to earthquake loads: reinforced concrete framed structure in a seismic zone. Three separate but connected buildings with a total contract value of £45m.
Structural Engineering
Croydon ‘Brick-by-Brick’
MAIN SERVICES: •£2.5m project •SIPS Superstructure constructed on steel framed podium. •External balcony frames designed for differential vertical movement. •Perimeter foundations designed to avoid surcharging