Wilde Consultants developed the design of a new track drainage system to help alleviate flooding and track quality issues through Great Rocks tunnel next to Tunstead Quarry near Buxton, Derbyshire. The site exhibited shallow bedrock throughout requiring the development of a high-capacity shallow drainage system utilising bespoke pre-cast concrete (PCC) channel drain units design for rail loadings.
The project was successfully completed in summer 2023.
Primary Services
• Contractors Responsible Engineer (CRE) for design
• Site assessment and survey specifications
• Track drainage and civils design
• Design interface with shallow bedrock
• Design of shallow Undertrack Crossings including pipe strength calculations and Network Rail standards derogation
• Design of bespoke PCC channel drainage units within the track support zone
• Compliance with Network Rail design assurance processes including Forms 002 & 3
• Design support during construction