Construction of 4 storey block incorporating 3 new units on the site of an old public house. Load bearing masonry supporting timber floors the older pub cellar was re-utilised as was the adjacent party wall to the re-adjoining terrace.
Structural Engineering
Croydon ‘Brick-by-Brick’
MAIN SERVICES: •£2.5m project •SIPS Superstructure constructed on steel framed podium. •External balcony frames designed for differential vertical movement. •Perimeter foundations designed to avoid surcharging