Investigation works/analysing /checking the existing structure to support the over-cladding material.
Structural Engineering
Croydon ‘Brick-by-Brick’
MAIN SERVICES: •£2.5m project •SIPS Superstructure constructed on steel framed podium. •External balcony frames designed for differential vertical movement. •Perimeter foundations designed to avoid surcharging