Dulwich College

Dulwich College

New composite block. New steel framed facility built on the site of the old swimming pool building. Piled foundations detailed around the existing pool structure. Building used as classrooms, sixth form block and changing rooms.

Share:

Related Case Studies

Structural Engineering

Croydon ‘Brick-by-Brick’

MAIN SERVICES: •£2.5m project •SIPS Superstructure constructed on steel framed podium. •External balcony frames designed for differential vertical movement. •Perimeter foundations designed to avoid surcharging

Read More »
Structural Engineering

Ferrier Point

Investigation works/analysing /checking the existing structure to support the over-cladding material.

Read More »