Diggle Brook Bridge Reconstruction

Client: Oldham MBC Location: New Saddleworth School, Oldham

Design of an integral precast concrete bridge to provide access to the New Saddleworth School. The bridge had to be designed such that it could be constructed in two halves allowing continuous access to the school construction site by an adjacent temporary bridge.

Working closely with framework partners and Oldham MBC staff the design was delivered on a tight timeline.

Share:

Related Case Studies