Section 38/278 highway scheme

Main Services:

  • Review of the highway and drainage design for a £25m developer promoted scheme for the realigning of the existing A57 carriageway.
  • Construction of a mile-long new dual carriageway link to Trafford Way.
  • Review of the wayfinding/signage design.
  • Checking the workmanship on site and materials testing.

Leave a Comment

Your email address will not be published. Required fields are marked *