Macclesfield Town Hall

Civil and structural engineering input focused on the modification and construction works associated with the installation of two new lifts, the widening of structural openings, the lowering of some ground floor areas, the removal of load bearing walls and the construction of new walls.

All works were determined to suit conservation requirements that derived from the Grade II* listed status, requiring close and regular liaison with the Conservation Officer, the Architect, the Client and the Contractor.

Leave a Comment

Your email address will not be published. Required fields are marked *