Main Services:
- Design and analysis for modifications for the decommissioning of Berkeley Caesium Removal Plant Project –Sludge & Resin (CRP) building.
- Finite element analysis of modified building (with new major door openings) to determine modified response to seismic loading.
- Design of required structural strengthening works to allow openings to be formed.