B241 Overbuilding & Services Building

Client: BNFL Location: Sheffield

Main Services:

  • Seismic analysis of steel framed overbuilding to B241 tanks.
  • Analysis carried out for part erected and fully erected frame to reflect progressive construction as building was slid into position.
  • Design of temporary works system to allow remote erection prior to sliding building into position.

Share:

Related Case Studies