Main Services:
- £1.3m Bridge deck replacement and highway re-alignment scheme.
- Bridge located on the main road into the Town Centre.
- Preparation of feasibility study, detailed design, procurement of contractors and on-site technical assistance.
- Overall width of bridge reduced to limit future maintenance costs. Steps constructed into existing abutments to link the town centre parks to the sea front tourist attractions (see before and after photos).
