UCL Medawar

Related Case Studies

Structural Engineering

Croydon ‘Brick-by-Brick’

MAIN SERVICES: •£2.5m project •SIPS Superstructure constructed on steel framed podium. •External balcony frames designed for differential vertical movement. •Perimeter foundations designed to avoid surcharging

Read More »
Structural Engineering

Ferrier Point

Investigation works/analysing /checking the existing structure to support the over-cladding material.

Read More »