Atherton track drainage renewal

Client: J Murphy & Sons Location: Atherton, Wigan

Project Overview / Excerpt

Wilde Consultants developed the design of a new track drainage system to help alleviate flooding and track quality issues at this site, just to the east of Atherton Station in Wigan. The presence of two buried high-pressure gas mains crossing beneath the railway at the problem area of the site required the development of a shallower depth overflow system for higher flow rates. The project was successfully completed in early 2021.

Primary Services

  • Contractors Responsible Engineer (CRE) for design
  • Site assessment and survey specifications
  • Track drainage and civils design
  • Catchment assessment and hydraulic modeling including exceedance modeling and flood routing
  • Design interface with buried high-pressure gas mains
  • Design of shallow Undertrack Crossing including pipe strength calculations and Network Rail standards derogation
  • Compliance with Network Rail design assurance processes including Forms 002 & 3
  • Design support during construction”